Case Studies2020-04-27T11:20:22+01:00

CASE STUDIES

We provide demolition and asbestos solutions throughout the UK, here you can view case studies detailing work carried out for just a few of our clients.

Arborfield Case Studies

Arborfield Garrison (Demolition of Sergeants’ Mess & Buildings 69 & 69A), Berkshire

Arborfield Garrison, Demolition, Dismantling & Soft Stripping|

Arborfield Garrison (Demolition of Sergeants' Mess & Buildings 69 & 69A), Berkshire OVERVIEW: Lawson Group would need to soft strip and demolish the old Sergeants’ Mess that was built in the 1940s along with Buildings 69 and 69A, otherwise known as Parcel AA. View PDF CHALLENGE [...]

Arborfield Garrison (Metal Footbridge and Footings Removal), Berkshire

Arborfield Garrison, Crane Work, Deconstruction|

Arborfield Garrison (Metal Footbridge and Footings Removal), Berkshire OVERVIEW: Lawson Group had to project manage the removal of a metal footbridge that spanned Biggs Lane. This was a part of a regeneration project of the former Arborfield Garrison in Berkshire. View PDF CHALLENGE [...]

Arborfield Garrison (Hazebrouck Barracks Asbestos Removal), Berkshire

Arborfield Garrison, Asbestos Removal|

Arborfield Garrison (Hazebrouck Barracks Asbestos Removal), Berkshire OVERVIEW: As part of the prestigious project at Arborfield in Berkshire, Hazebrouck Barracks needed licensed asbestos to be removed from five of its buildings. Lawson Environmental (part of Lawson Group) were utilised to carry out this specialist work. View PDF [...]

Load More Posts

Other Case Studies

Government Communications Headquarters (GCHQ), Cheltenham

Case Studies, Crushing & Screening, Demolition, Dismantling & Soft Stripping|

Government Communications Headquarters (GCHQ), Cheltenham OVERVIEW: Lawson Group were awarded the responsibility of asbestos removal and the demolition of the former Government Communications Headquarters (GCHQ) in its entirety, located to the east of Cheltenham. Government Communications left famous Bletchley Park in the 1950s and came to Oakley Park, Cheltenham as the government [...]

Carlton Street Multi-Storey Car Park, Swindon

Case Studies, Demolition, Dismantling & Soft Stripping|

Carlton Street Multi-Storey Car Park, Swindon OVERVIEW: Lawson Demolition were awarded the contract for the demolition of Carlton Street multi-storey car park adjacent to Swindon’s bus station, the demolition of the Wyvern multi-storey car park and both associated footbridges, including the removal of Princes Street footbridge. It was a three-part project broken [...]

Testimonials

“We have made a good start to the Project, thanks to the great strip out works from Lawsons, which took place last week.”

Manager, VolkerFitzpatrick

It has been a pleasure to work with Lawson Demolition; a very well organised and professional company. The operatives and site management are a credit to the organisation. Lawson Demolition’s performance on site was recognised by our senior management, including our Health and Safety Manager.

Senior Project Manager, VolkerFitzpatrick

We continue to be impressed by the professional approach of the team at Lawson Group, from the operatives on site through to the management team. The demolition was completed on time and on budget, to an exceptionally high standard.

Building Surveyor, Swindon Capita Partnership

The quality of written information that we receive from Lawson Group Ltd, and the level of health and safety which they practice on site is outstanding.

Production Manager, Taylor Wimpey

Thanks for your quotation, we are looking to appoint a contractor and as you have done such a great job at XXXXXXX we would like it to be you…

Quantity Surveyor, Taylor Wimpey
Following my site visit yesterday where I met your site manager I can confirm that Lawsons have now completed the demolition of the existing buildings to our satisfaction.
Many thanks for your cooperation in completing this contract.
Regional Director, Faithful+Gould

…just wanted to say thank you to Lawson Demo Ltd, this project has run very smoothly and I will be recommending you to my colleagues in the office and will certainly come back to Lawson Group in the future.

Associate Quantity Surveyor, PMP Consultants

“Site Manager George doing an excellent job liaising with residents and site staff. Overall I am really pleased with progress and site management.”

Project Manager, Construction & Property Consultants