Case Studies2019-07-17T13:02:38+01:00

CASE STUDIES

We provide demolition and asbestos solutions throughout the UK, here you can view case studies detailing work carried out for just a few of our clients.

St Peters Hall, Hinton Road, Bournemouth

Case Studies, Demolition, Dismantling & Soft Stripping|

St Peters Hall, Hinton Road, Bournemouth OVERVIEW: Lawson Group were responsible for the demolition and party wall separation of a former nightclub in the city centre of Bournemouth. Originally built in 1908 as the Playhouse Theatre, the building was later used as a church by the Wessex Christian Centre and then returned [...]

Darby House, Swindon

Asbestos Removal, Case Studies, Demolition, Dismantling & Soft Stripping|

Darby House, Swindon OVERVIEW: Lawson Group would be responsible for the demolition and asbestos removal of the former multi-storey concrete framed office block. VIEW PDF CHALLENGE Extensive removal of Asbestos Insulation Board (AIB) boxing, cladding, heating panels, soffits, external soffits and fascias [...]

Taylor’s Yard (Travis Perkin), Cheltenham

Asbestos Removal, Case Studies, Crushing & Screening, Demolition, Dismantling & Soft Stripping|

Taylor’s Yard (Travis Perkin), Cheltenham OVERVIEW: Lawson Group undertook the demolition and soft strip project of a former Travis Perkins site in Cheltenham. VIEW PDF CHALLENGE The site was located off Gloucester Road in Cheltenham which meant it was in close vicinity to [...]

Westgate, Bristol

Case Studies, Demolition, Dismantling & Soft Stripping|

Westgate, Bristol OVERVIEW: Lawson Group were awarded the contract to produce a full soft strip out at Westgate, a five-floor office block. Located in Bristol’s city centre, the regeneration of this 90,000 sq ft office building required a strategic methodology to ensure there was minimal disruption to the public. The programme was [...]

Valentine Place, London SE1

Case Studies|

Valentine Place, London SE1 OVERVIEW: Lawson Group were awarded the contract to remove the licensed asbestos and demolish the former studios and warehouses which were in the heart of cultural London. Lawson Group produced technical demolition and deconstruction of a building that included façade retention of the front wall which survived damage [...]

Testimonials

“We have made a good start to the Project, thanks to the great strip out works from Lawsons, which took place last week.”

Manager, VolkerFitzpatrick

It has been a pleasure to work with Lawson Demolition; a very well organised and professional company. The operatives and site management are a credit to the organisation. Lawson Demolition’s performance on site was recognised by our senior management, including our Health and Safety Manager.

Senior Project Manager, VolkerFitzpatrick

We continue to be impressed by the professional approach of the team at Lawson Group, from the operatives on site through to the management team. The demolition was completed on time and on budget, to an exceptionally high standard.

Building Surveyor, Swindon Capita Partnership

The quality of written information that we receive from Lawson Group Ltd, and the level of health and safety which they practice on site is outstanding.

Production Manager, Taylor Wimpey

Thanks for your quotation, we are looking to appoint a contractor and as you have done such a great job at XXXXXXX we would like it to be you…

Quantity Surveyor, Taylor Wimpey
Following my site visit yesterday where I met your site manager I can confirm that Lawsons have now completed the demolition of the existing buildings to our satisfaction.
Many thanks for your cooperation in completing this contract.
Regional Director, Faithful+Gould

…just wanted to say thank you to Lawson Demo Ltd, this project has run very smoothly and I will be recommending you to my colleagues in the office and will certainly come back to Lawson Group in the future.

Associate Quantity Surveyor, PMP Consultants