Arborfield Case Studies

Arborfield Garrison (Parcel X and Y Demolition), Berkshire

Arborfield Garrison, Asbestos Removal, Bat Investigation, Crushing & Screening, Demolition, Dismantling & Soft Stripping|

Arborfield Garrison (Parcel X and Y Demolition), Berkshire OVERVIEW: As part of a demolition programme of the entire Arborfield Garrison site, Lawson Group were asked to demolish buildings that formed an area known as Parcel X and Y. View PDF CHALLENGE This would [...]

Arborfield Garrison (Parcel X and Y Licensed Asbestos Removal), Berkshire

Arborfield Garrison, Asbestos Removal|

Arborfield Garrison (Parcel X and Y Licensed Asbestos Removal), Berkshire OVERVIEW: As part of a demolition programme of the entire Arborfield Garrison site, Lawson Environmental (part of Lawson Group) were contracted to remove licensed asbestos from buildings that formed an area known as Parcel X and Y. View PDF [...]

Suitable Alternative Natural Green Spaces (SANGS) – Arborfield Garrison, Berkshire

Arborfield Garrison, Bat and Bird Boxes, Bat Barns and Earth Moves, Bunding, Pond Creation, SUD, Tree Removal|

Suitable Alternative Natural Green Spaces (SANGS) – Arborfield Garrison, Berkshire OVERVIEW: As part of the overall package for Arborfield, Suitable Alternative Natural Green Spaces, also known as SANGS 1 and 2 had to be developed. View PDF CHALLENGE This would involve dealing with [...]

Other Case Studies

NHS Centre – Kimmerfields, Swindon

Asbestos Removal, Case Studies, Demolition, Dismantling & Soft Stripping|

NHS Centre - Kimmerfields, Swindon OVERVIEW: Lawson Group won the contract to demolish a walk-in NHS centre located in Swindon. View PDF CHALLENGE The site was located within Swindon town centre, adjacent to an operational bus station, the Zurich Tri-Centre offices, and close [...]

Harrow Council Depot, Greater London

Asbestos Removal, Case Studies, Demolition, Dismantling & Soft Stripping|

Harrow Council Depot, Greater London OVERVIEW: Lawson Group won the contract to soft strip, remove licensed asbestos from, and demolish this former council depot site in Harrow. View PDF CHALLENGE The site was located on Forward Drive, Harrow. This was a heavily populated [...]

Crown Bank Toilet Block, Stoke-on-Trent

Case Studies, Reinstatement Works, Slab and Foundation Removal|

Crown Bank Toilet Block, Stoke-on-Trent OVERVIEW: The contract to remove a former public toilet building, in Stoke-on-Trent’s main city centre, was awarded to Lawson Group. View PDF CHALLENGE here were shops and residential properties that surrounded the site, with a one-way access [...]

Demolition of footbridges associated to Multi-Storey Car Parks, Swindon

Case Studies|

Demolition of footbridges associated to Multi-Storey Car Parks, Swindon OVERVIEW: Phase 2 of this contract consisted of the demolition of two footbridges. The first stood between Swindon’s Wyvern Theatre and the Wyvern multi-storey car park and the second located next to the theatre that spanned across a dual carriageway. These works formed [...]

Testimonials

“We have made a good start to the Project, thanks to the great strip out works from Lawsons, which took place last week.”

Manager, VolkerFitzpatrick

It has been a pleasure to work with Lawson Demolition; a very well organised and professional company. The operatives and site management are a credit to the organisation. Lawson Demolition’s performance on site was recognised by our senior management, including our Health and Safety Manager.

Senior Project Manager, VolkerFitzpatrick

We continue to be impressed by the professional approach of the team at Lawson Group, from the operatives on site through to the management team. The demolition was completed on time and on budget, to an exceptionally high standard.

Building Surveyor, Swindon Capita Partnership

The quality of written information that we receive from Lawson Group Ltd, and the level of health and safety which they practice on site is outstanding.

Production Manager, Taylor Wimpey

Thanks for your quotation, we are looking to appoint a contractor and as you have done such a great job at XXXXXXX we would like it to be you…

Quantity Surveyor, Taylor Wimpey
Following my site visit yesterday where I met your site manager I can confirm that Lawsons have now completed the demolition of the existing buildings to our satisfaction.
Many thanks for your cooperation in completing this contract.
Regional Director, Faithful+Gould

…just wanted to say thank you to Lawson Demo Ltd, this project has run very smoothly and I will be recommending you to my colleagues in the office and will certainly come back to Lawson Group in the future.

Associate Quantity Surveyor, PMP Consultants

“Site Manager George doing an excellent job liaising with residents and site staff. Overall I am really pleased with progress and site management.”

Project Manager, Construction & Property Consultants