Longcross Studios Building #99 Tower, Chertsey

Longcross Studios Building #99 Tower, Chertsey OVERVIEW: Lawson Group was awarded the title of principal contractor for this prestigious project located near Chertsey, approximately 25 miles west of London. It involved the removal of specific buildings, and a drainage and services package within the site. Set in over 200 acres, the area [...]

Longcross Studios – Buildings #100 & #101, Chertsey

Longcross Studios - Buildings #100 & #101, Chertsey OVERVIEW: Lawson Group was awarded the title of principal contractor for this prestigious project located near Chertsey, approximately 25 miles west of London. It involved the removal of specific buildings, and a drainage and services package within the site. Set in over 200 acres, [...]

Tottenham Hale White Hart Pub, London

Tottenham Hale White Hart Pub, London OVERVIEW: The site was a former public house set on the North Island corner plot in Tottenham Hale. The building was three storeys high with a basement covering the area of the building. There was also a single-storey section of the building that adjoined the neighbouring [...]

NHS Centre – Kimmerfields, Swindon

NHS Centre - Kimmerfields, Swindon OVERVIEW: Lawson Group won the contract to demolish a walk-in NHS centre located in Swindon. View PDF CHALLENGE The site was located within Swindon town centre, adjacent to an operational bus station, the Zurich Tri-Centre offices, and close [...]

Harrow Council Depot, Greater London

Harrow Council Depot, Greater London OVERVIEW: Lawson Group won the contract to soft strip, remove licensed asbestos from, and demolish this former council depot site in Harrow. View PDF CHALLENGE The site was located on Forward Drive, Harrow. This was a heavily populated [...]

St Peters Hall, Hinton Road, Bournemouth

St Peters Hall, Hinton Road, Bournemouth OVERVIEW: Lawson Group were responsible for the demolition and party wall separation of a former nightclub in the city centre of Bournemouth. Originally built in 1908 as the Playhouse Theatre, the building was later used as a church by the Wessex Christian Centre and then returned [...]

Darby House, Swindon

Darby House, Swindon OVERVIEW: Lawson Group would be responsible for the demolition and asbestos removal of the former multi-storey concrete framed office block. VIEW PDF CHALLENGE Extensive removal of Asbestos Insulation Board (AIB) boxing, cladding, heating panels, soffits, external soffits and fascias [...]

Taylor’s Yard (Travis Perkin), Cheltenham

Taylor’s Yard (Travis Perkin), Cheltenham OVERVIEW: Lawson Group undertook the demolition and soft strip project of a former Travis Perkins site in Cheltenham. VIEW PDF CHALLENGE The site was located off Gloucester Road in Cheltenham which meant it was in close vicinity to [...]

Westgate, Bristol

Westgate, Bristol OVERVIEW: Lawson Group were awarded the contract to produce a full soft strip out at Westgate, a five-floor office block. Located in Bristol’s city centre, the regeneration of this 90,000 sq ft office building required a strategic methodology to ensure there was minimal disruption to the public. The programme was [...]

Go to Top