Darby House, Swindon

Darby House, Swindon OVERVIEW: Lawson Group would be responsible for the demolition and asbestos removal of the former multi-storey concrete framed office block. VIEW PDF CHALLENGE Extensive removal of Asbestos Insulation Board (AIB) boxing, cladding, heating panels, soffits, external soffits and fascias [...]

Taylor’s Yard (Travis Perkin), Cheltenham

Taylor’s Yard (Travis Perkin), Cheltenham OVERVIEW: Lawson Group undertook the demolition and soft strip project of a former Travis Perkins site in Cheltenham. VIEW PDF CHALLENGE The site was located off Gloucester Road in Cheltenham which meant it was in close vicinity to [...]

Westgate, Bristol

Westgate, Bristol OVERVIEW: Lawson Group were awarded the contract to produce a full soft strip out at Westgate, a five-floor office block. Located in Bristol’s city centre, the regeneration of this 90,000 sq ft office building required a strategic methodology to ensure there was minimal disruption to the public. The programme was [...]

Valentine Place, London SE1

Valentine Place, London SE1 OVERVIEW: Lawson Group were awarded the contract to remove the licensed asbestos and demolish the former studios and warehouses which were in the heart of cultural London. Lawson Group produced technical demolition and deconstruction of a building that included façade retention of the front wall which survived damage [...]

2019-06-27T10:46:35+01:00By |Case Studies|0 Comments

Royal United Hospital, Bath

Royal United Hospital, Bath OVERVIEW: Lawson Group were awarded the contract to complete the removal of licensed asbestos and demolition of several units at Royal United Hospital, Bath. The works comprised of the demolition of the existing Kinghorn Dermatology and Discharge Centre. This was a single storey building constructed in 1943 from [...]

2019-06-27T10:49:15+01:00By |Case Studies|0 Comments

Former Bus Depot, Muller Road, Bristol

Former Bus Depot, Muller Road, Bristol OVERVIEW: Lawson Group were awarded the contract to undertake the licensed asbestos removal, demolition and removal of tanks and protection of underground of infrastructure at a former Bus Depot site in Bristol Centre. The bus depot had been operational but then left redundant for several years. [...]

Go to Top