Crown Bank Toilet Block, Stoke-on-Trent

Crown Bank Toilet Block, Stoke-on-Trent OVERVIEW: The contract to remove a former public toilet building, in Stoke-on-Trent’s main city centre, was awarded to Lawson Group. View PDF CHALLENGE here were shops and residential properties that surrounded the site, with a one-way access [...]

Demolition of footbridges associated to Multi-Storey Car Parks, Swindon

Demolition of footbridges associated to Multi-Storey Car Parks, Swindon OVERVIEW: Phase 2 of this contract consisted of the demolition of two footbridges. The first stood between Swindon’s Wyvern Theatre and the Wyvern multi-storey car park and the second located next to the theatre that spanned across a dual carriageway. These works formed [...]

2019-11-25T13:06:30+00:00By |Case Studies|0 Comments

Gloucester Place, Cheltenham

Gloucester Place, Cheltenham OVERVIEW: This project involved the demolition and asbestos removal of the complex known as Gloucester Place in Cheltenham town centre. It included the demolition of the former cinema, main dealer garage and independent local shops as part of the redevelopment of the area - in readiness for transforming it [...]

2019-11-25T13:06:47+00:00By |Case Studies|0 Comments

St Peters Hall, Hinton Road, Bournemouth

St Peters Hall, Hinton Road, Bournemouth OVERVIEW: Lawson Group were responsible for the demolition and party wall separation of a former nightclub in the city centre of Bournemouth. Originally built in 1908 as the Playhouse Theatre, the building was later used as a church by the Wessex Christian Centre and then returned [...]

Darby House, Swindon

Darby House, Swindon OVERVIEW: Lawson Group would be responsible for the demolition and asbestos removal of the former multi-storey concrete framed office block. VIEW PDF CHALLENGE Extensive removal of Asbestos Insulation Board (AIB) boxing, cladding, heating panels, soffits, external soffits and fascias [...]

Taylor’s Yard (Travis Perkin), Cheltenham

Taylor’s Yard (Travis Perkin), Cheltenham OVERVIEW: Lawson Group undertook the demolition and soft strip project of a former Travis Perkins site in Cheltenham. VIEW PDF CHALLENGE The site was located off Gloucester Road in Cheltenham which meant it was in close vicinity to [...]

Westgate, Bristol

Westgate, Bristol OVERVIEW: Lawson Group were awarded the contract to produce a full soft strip out at Westgate, a five-floor office block. Located in Bristol’s city centre, the regeneration of this 90,000 sq ft office building required a strategic methodology to ensure there was minimal disruption to the public. The programme was [...]

Phase 2: Wyvern Multi-Storey Car Park,

Phase 2: Wyvern Multi-Storey Car Park, OVERVIEW: The Wyvern MSCP was constructed in 1971 and provided 283 car parking spaces across five floors, the structure was approximately 90m long and 20m wide. VIEW PDF CHALLENGE The car park to be demolished by [...]

Go to Top