Valentine Place, London SE1
Valentine Place, London SE1 OVERVIEW: Lawson Group were awarded the contract to remove the licensed asbestos and demolish the former studios and warehouses which were in the heart of cultural London. Lawson Group produced technical demolition and deconstruction of a building that included façade retention of the front wall which survived damage [...]
Bourne Court, Ruislip
Bourne Court, Ruislip OVERVIEW: This project would involve the soft strip, asbestos removal and demolition of three main local authority buildings plus garages that were part of an old office complex. Lawson Group would prepare the site for the next stage of development which was to be a housing scheme. View [...]
Summerstown, London
Summerstown, London OVERVIEW: The works comprised of the demolition of a light industrial building along with the removal of slab, foundation, hardstanding and asbestos. The site was located to the west of Summerstown and to the east of the former Wimbledon Football Club stadium. View PDF [...]
Royal United Hospital, Bath
Royal United Hospital, Bath OVERVIEW: Lawson Group were awarded the contract to complete the removal of licensed asbestos and demolition of several units at Royal United Hospital, Bath. The works comprised of the demolition of the existing Kinghorn Dermatology and Discharge Centre. This was a single storey building constructed in 1943 from [...]
Former Bus Depot, Muller Road, Bristol
Former Bus Depot, Muller Road, Bristol OVERVIEW: Lawson Group were awarded the contract to undertake the licensed asbestos removal, demolition and removal of tanks and protection of underground of infrastructure at a former Bus Depot site in Bristol Centre. The bus depot had been operational but then left redundant for several years. [...]
Ilford Rail Depot, London
Ilford Rail Depot, London OVERVIEW: Lawson Group would be responsible for the decommissioning and demolition of several structures and industrial units within a live rail depot. These included demolition of a footbridge and stairs removal, the paint shop, various training buildings and Workshop B. View PDF [...]
Arborfield Case Studies
Testimonials
“We have made a good start to the Project, thanks to the great strip out works from Lawsons, which took place last week.”
It has been a pleasure to work with Lawson Demolition; a very well organised and professional company. The operatives and site management are a credit to the organisation. Lawson Demolition’s performance on site was recognised by our senior management, including our Health and Safety Manager.
We continue to be impressed by the professional approach of the team at Lawson Group, from the operatives on site through to the management team. The demolition was completed on time and on budget, to an exceptionally high standard.
The quality of written information that we receive from Lawson Group Ltd, and the level of health and safety which they practice on site is outstanding.
Thanks for your quotation, we are looking to appoint a contractor and as you have done such a great job at XXXXXXX we would like it to be you…
Following my site visit yesterday where I met your site manager I can confirm that Lawsons have now completed the demolition of the existing buildings to our satisfaction.
Many thanks for your cooperation in completing this contract.
…just wanted to say thank you to Lawson Demo Ltd, this project has run very smoothly and I will be recommending you to my colleagues in the office and will certainly come back to Lawson Group in the future.
“Site Manager George doing an excellent job liaising with residents and site staff. Overall I am really pleased with progress and site management.”