Today is Throwback Thursday! In a year where we are commemorating our 30th anniversary, we take a look back at one of our many successfully completed projects in London. This one was captured on a time-lapse video in 2019 which can be seen here: https://www.youtube.com/watch?v=ACPHXr7Vr3I 

The works comprised of the demolition of a light industrial building along with the safe removal of slab, foundation, hardstanding, and asbestos. The site was located to the west of Summerstown and to the east of the former Wimbledon Football Club stadium.

All loose fixtures and fittings were removed and segregated for recycling or disposal. The foundations and ground floor slab were excavated, and arisings were processed to the client’s requirements.

The works were successfully completed within budget and the site was handed back to the client on time and ready for the next stage of the development.

You can read the full case study on our website here: https://www.lawsongroup.co.uk/wp-content/uploads/2019/06/Summerstown-Case-Study-v2019w.pdf

Throughout 2021, we will be sharing our history with you on various platforms, along with discussing how the demolition and asbestos removal industry has changed over the last three decades, and looking forward to the next thirty years.

To find out more, please give us a call on 01793 782000 or email enquiries@lawsongroup.co.uk